![background image](http://html.mh-extra.com/html/kato/premium-cityrange-cr-200rf/premium-cityrange-cr-200rf_instruction-manual_657900061.webp)
- 35 -
4. Safety signs
WARNING
Sa
fe
ty s
ig
ns
4. Safety signs
(T218351-015-0E)
The safety signs are stuck on in the places shown in the diagram. Check all of them before you start to operate the
crane.
Keep the safety signs clean at all times so that they are clearly visible and easy to read.
・
If a safety sign is dirty, use water or a neutral cleaner to remove the dirt. Do not use gasoline
or organic solvents.
・
If it is not possible to remove the dirt or if a safety sign is damaged or peeling, replace the
safety sign with new.
Refer to the parts list on the crane and order a new sign from your authorised KATO dealer to
replace the safety sign.
・
When you replace a safety sign, always check that it is identical to the original.
(541A-0041-2E)
(1) Slewing upper structure
Summary of Contents for PREMIUM CITYRANGE CR-200RF
Page 2: ...218711 背厚 14 5 mm 中 ...
Page 14: ... 12 4 Dimensions T217591 021 0E Specification of CR 200Rf ...
Page 16: ... 14 MEMO ...
Page 24: ... 22 MEMO ...
Page 30: ... 4 MEMO ...
Page 36: ... 10 MEMO ...
Page 38: ... 12 3 General operation devices 2 Outside the cab ...
Page 60: ... 34 MEMO ...
Page 74: ... 48 MEMO ...
Page 82: ... 56 7 Air conditioner 7 6 Display when errors are detected T217921 020 0E ...
Page 120: ... 94 MEMO ...
Page 129: ... 102 MEMO ...
Page 138: ... 111 17 Drive operation devices Drive operation devices ...
Page 139: ... 112 17 Drive operation devices ...
Page 153: ... 126 17 Drive operation devices ...
Page 154: ... 127 17 Drive operation devices Drive operation devices ...
Page 237: ... 208 21 Crane operation devices 21 Crane operation devices 061A 0005 0E 1 Inside the cab ...
Page 238: ... 209 21 Crane operation devices Crane operation devices ...
Page 239: ... 210 21 Crane operation devices 2 Outside the cab ...
Page 259: ... 230 22 Crane operation when the outriggers are used ON OFF ...
Page 299: ... 270 24 Crane operation NOTE Extension retraction sequence for each boom length ...
Page 320: ...26 Preoperational checks Pre drive checks 290 ...
Page 321: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 291 ...
Page 322: ...26 Preoperational checks Pre drive checks 292 ...
Page 329: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 299 ...
Page 330: ...26 Preoperational checks Pre drive checks 300 ...
Page 331: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 301 ...
Page 332: ... 302 MEMO ...
Page 340: ... 310 MEMO ...
Page 342: ...899 92187110 ...