Tire Changer KT-830 User’s Manual
14
3.1.2 Installation equipment and tools
◇
Installation equipment and tools
3.1.3 inspection products
◇
The shipment should be thoroughly inspected as soon as it is received. The signed Bill
of Lading is acknowledgement by the shipping carrier as receipt of this product as listed
in your invoice as being in a good condition of shipment. If any of these goods listed on
this Bill of Lading are missing or damaged, do not accept goods until the shipping carrier
makes a notation on the freight bill of the missing or dam- aged goods. Do this for your
own protection.
3.1.4 Unpacking
◇
Check the packaging damage and
the rain and other damage
phenomenon, using the tool unpack
the packing as shown in Picture,
please dispose of packaging box,
lest the environmental pollution.
◇
Check the condition of the machine,
in accordance with the packing list
to check if there is any damage or
lost, once found contact the dealer
and manufacture immediately. If
you find that the leakage but still installed, we will not assume any responsibility. If you
have any questions, please do not use the machine, the supplier contact.
3.2 Precautions during installation
◇
All bolts must be tightened.
◇
Power cord, no broken skin, no broken pipe, and other damage.
Figure 5