EN
15
TESTING
1. Connect test connector to male quick-
coupling 8 mm, open venting valve and
pump 20 times. If the product is working
properly it should be easy to pull up and
press down the handle by applying about
2.4 kg.
2. Close the venting valve and open it again
when the pressure reaches 100 bar to
relieve the pressure.
3. Close the venting valve, pump up to 200
bar and wait 2 minutes. Check that the
pressure shown on the pressure gauge
does not drop (which would indicate
leakage). To check for leakage put the
pump base in water, together with the
inlet hose and test connector.
USE
1. Make sure the hose is not bent or tangled.
2. Connect the pump to the equipment with
original parts.
3. Close the venting valve.
4. Stabilise the product with foot on the
base.
5. Move the handle up and down to pump.
When the pressure exceeds 100 bar the
pumping is stiffer. This is perfectly normal.
6. After pumping, open the venting valve to
release residual air in the pump and hose.
A little fluid can come out, this is perfectly
normal.
WARNING!
Do not release the connections before the
pressure is relieved.
MAINTENANCE
1. Lubricate the product after 800 cycles.
Apply 3 drops of silicone oil on the top
handle and a few drops in the secondary
stage tube.
2. Check that the female connector is
correctly mounted, otherwise there is a
risk of seizure. The dimension of the quick-
coupling is 8 mm.
3. Relieve the pressure in the product when
not in use. Do not bend or fold the hose,
or knock the pressure gauge.
4. The cooling water is contained between
the secondary and tertiary tube. No
refilling is necessary. The water cooling
works through the transfer of heat. It is
normal for the product to feel hot when
in use.
Summary of Contents for 016592
Page 4: ...2 2 1 3 5 4 6 8 7 9...