Maintenance by operating
personnel
This manual describes maintenance
work for “operating personnel”! The
description of maintenance work that
must be carried out by “qualified per
-
sonnel” can be found in the documenta-
tion “
Maintenance & Service
”.
Tools and aids
4
Hexagon socket screwdriver
(AF 4 / 60 mm)
OK
Complete the procedure with “OK”.
Number of operating personnel required
for this maintenance.
The following chapters describe work steps that are
necessary for maintenance and care measures. The
tools required for correct and safe performance are
shown at the beginning of each chapter.
• Generally, assembly is carried out in reverse order,
similar to disassembly. In case of deviations, this is
specifically pointed out!
• If you open the bench or one of the acrylic panes,
a warning message must be reset with “OK” after
closing.
Unlocking the bench
OK
Attention
The bench may only be opened with the
bench pane in place.
③
②
①
②
⇒
Fold up the canopy.
①
Press the bench down slightly and hold it
down.
②
Reach into the lower recess in the centre of
the front panel.
③
Pull the lever to unlock.
⇒
Unfold the bench.
Operating instructions
| 1/2
| megaSun K5/K6/K7 PRODUCT SERIES
39
Summary of Contents for MegaSun K7S
Page 1: ...OPERATING INSTRUCTIONS PART 1 2 PRODUCT LINE...
Page 2: ......
Page 52: ...Remarks Operating instructions 1 2 megaSun K5 K6 K7 PRODUCT SERIES 52...
Page 53: ...Remarks Operating instructions 1 2 megaSun K5 K6 K7 PRODUCT SERIES 53...
Page 54: ...Remarks Operating instructions 1 2 megaSun K5 K6 K7 PRODUCT SERIES 54...
Page 55: ......