OPERATING THE MACHINE
5-15
Digging and Loading Level Ground
IMPORTANT: While excavating with the bucket or fork,
never apply excessive force to the tooth tips with the
bucket or fork tilted more than 10°. This may result in
cracks or damage to the front attachment.
Slightly position the bucket teeth downward (0 to 10
degrees) and dig the ground while moving the machine
forward as described below. Always take care not to apply
loads to only to one side of the bucket.
1. Position the bucket teeth slightly downward (dump
forward 10 degrees or less).
2. While moving the machine forward in 1st or 2nd
speed, roll the bucket forward so that the ground
surface is gradually lifted.
Increase engine speed as the bucket digs deeper.
3. Adjust the digging depth by operating the lift arm.
4. When the bucket is filled, move the machine with the
bucket fully rolled back. Clear the ground and held at
the lowest possible position.
M4GB-05-007
M4GB-05-008
M4GB-05-009
M4GB-05-010
Summary of Contents for 70Z7
Page 2: ...93108 00691 April 2015...
Page 5: ......
Page 11: ...MACHINE NUMBERS 2 MEMO...
Page 51: ...SAFETY LABELS S 40 6 10 4 1 3 9 6 5 SS 3461...
Page 171: ...OPERATOR S STATION 1 110 MEMO...
Page 173: ...BREAK IN 2 2 MEMO...
Page 187: ...OPERATING THE ENGINE 3 14 MEMO...
Page 231: ...OPERATING THE MACHINE 5 24 MEMO...
Page 359: ...MAINTENANCE 7 118 MEMO...
Page 363: ...MAINTENANCE UNDER SPECIAL ENVIRONMENTAL CONDITIONS 9 4 MEMO...
Page 367: ...STORAGE 10 4 MEMO...