MAINTENANCE
7-60
Refueling
1. Park the machine following the same procedures as
described on page 7-7 for preparation of inspection/
maintenance work.
IMPORTANT: The turbocharger may be damaged if the
engine is not properly shut down.
WARNING: Handle fuel carefully. Shut the engine off
before fueling. Do not smoke while you fill the fuel
tank or work on fuel system.
2. Check fuel gauge (1) on the monitor panel. Add fuel if
necessary.
IMPORTANT: Keep all dirt, dust, water and other foreign
materials out of the fuel system.
3. To avoid condensation, fill the tank at the end of
each day’s operation. Take care not to spill fuel on the
machine or ground.
Fuel tank capacity: 235 liters (62 gallons)
4. Install and lock fill cap (2) immediately after fueling.
1
2
MNEC-01-002
MNDB-01-026
Summary of Contents for 70Z7
Page 2: ...93108 00691 April 2015...
Page 5: ......
Page 11: ...MACHINE NUMBERS 2 MEMO...
Page 51: ...SAFETY LABELS S 40 6 10 4 1 3 9 6 5 SS 3461...
Page 171: ...OPERATOR S STATION 1 110 MEMO...
Page 173: ...BREAK IN 2 2 MEMO...
Page 187: ...OPERATING THE ENGINE 3 14 MEMO...
Page 231: ...OPERATING THE MACHINE 5 24 MEMO...
Page 359: ...MAINTENANCE 7 118 MEMO...
Page 363: ...MAINTENANCE UNDER SPECIAL ENVIRONMENTAL CONDITIONS 9 4 MEMO...
Page 367: ...STORAGE 10 4 MEMO...