13-2
Quick Coupler
OTHER ATTACHMENTS AND DEVICE
M4GB-01-175
1
5
6
5. Roll back coupler (3) with attachment to align the
attachment pin holes with the coupler plungers.
6. Press hydraulic coupler switch (1) down to "lock" position
(5) while sliding lock switch (6) to your side.
Hold the bucket control lever in the “Roll Back” position
until the coupler plungers are fully extended.
7. Visually confirm engagement of plungers by lifting
coupler into view.
WARNING: Do not operate the machine if attachment
is loose. Visually check the coupler to verify it is
securely attached. Make sure plungers are fully
engaged into attachment ribs.
8. Connect hydraulic hoses, if necessary.
90M4GB-13-07
90Z7-13-05
Rollback with
attachment
3
Summary of Contents for 70Z7
Page 2: ...93108 00691 April 2015...
Page 5: ......
Page 11: ...MACHINE NUMBERS 2 MEMO...
Page 51: ...SAFETY LABELS S 40 6 10 4 1 3 9 6 5 SS 3461...
Page 171: ...OPERATOR S STATION 1 110 MEMO...
Page 173: ...BREAK IN 2 2 MEMO...
Page 187: ...OPERATING THE ENGINE 3 14 MEMO...
Page 231: ...OPERATING THE MACHINE 5 24 MEMO...
Page 359: ...MAINTENANCE 7 118 MEMO...
Page 363: ...MAINTENANCE UNDER SPECIAL ENVIRONMENTAL CONDITIONS 9 4 MEMO...
Page 367: ...STORAGE 10 4 MEMO...