Missing connection fix:
A jumper must be connected between the top of R14 and R13 as shown the following picture and diagram. A capacitor
lead clipping can be used for the jumper. Adding this jumper connects 5V to R14 and R19, which should have been
connected to the via to the right of the top of R14.
Jack wiring
●
Cut the insulated hookup wire to lengths about 1.5” long.
Install the wires to the top side of the board, then connect to
the corresponding connections on the jacks.
●
If mounting the board in an Altoids tin, the jacks will mount
as close to the bottom side of the board as possible. In order
for this to work, the wires need to come off the top side of
the board and wrap back around the edge to connect to the
jacks.
Jacks shown wired into an Altoids tin.
Antenna jack wiring in tin.
11
Add jumper
here.
Add Jumper
Summary of Contents for Mountain Topper
Page 22: ...Schematics Receiver section 22 ...
Page 23: ...CPU TRANSMITTER Sections 23 ...