3) The other end is inserted into the Bypass Switch.
4) The D/C connector is inserted in to the Anderson 4 Pole DC receptacle.
Notice the Red, Black and Green PP connectors with a lock-out pin. The DC connector is not reversible, but it
will only fit in one configuration. (Fully seated, these connectors will latch using the side compression tabs that
prevent the removal of the harnesses.)
.
The DBL MX-1000U-48, 1500U-48, 2000U-48 use 4 battery in
Series
for a total of 48VDC.
After the batteries have been connected,
it is good practise to always verify the DC voltage using a Digital Multi-
meter before connecting to the UPS.
Insert the DC 4 pole connector until it is fully seated. The DC uses a resetable breaker or internal fusing
Place the switch to Bypass position.
Section 9.0, will cover the Start Up of the UPS when all the cables and terminations have been made.
For the Timer and Relay Outputs, go to section 12.
12.9v
22
DBL MX-U Series UPS Outdoors 1000-2000W 120V Manual English
20180312
- This manual is for qualified personnel only