58
INSTALLATION AND CONNECTION
3.9.6 Power on
• Connect the power supply cable to C6 E22 BOX/PANEL.
• Fix the power connector as indicated in the picture. Use the lateral screws of the
power connector.
Figure 58: Power on
The system begins bootstrapping.
• The front panel On/Off/Standby LED will turn on.
Front Panel
On/Off/Standby LED
Power supply LED
Figure 59: Power on
• The yellow LED turns on for less than a second. After that, a persistent green LED
indicates the normal operation.
Summary of Contents for C6 E22 BM-RVL
Page 1: ...EMBEDDED IPCS INSTRUCTIONS FOR USE E22 BOX PANEL Original Manual Document 20146638 EN 01 ...
Page 2: ......
Page 11: ...11 List of Figures Figure 89 External connectors 108 Figure 90 Buttons position detail 108 ...
Page 48: ...48 Installationand connection ...
Page 96: ...96 Drawings 7 1 4 C6 E22 PANEL SL S1 12 1 W Figure 75 12 1 Wide dimensions ...
Page 110: ...110 Certificatesandapprovals 8 Certificates and approvals 8 1 EU Declaration of conformity ...
Page 111: ...111 Certificatesandapprovals ...
Page 114: ......