22
Figure 17
Configuration and project creation
Figure 18
Process management
2.11
Putting in operation C6 HMI / C6 HMI LC
To put in operation C6 HMI / C6 HMI LC the followings two phases must be done:
● Configuration and creation of the project of C6 HMI / C6 HMI LC.
● Process management.
2.11.1
Configuration and project creation
During the configuration phase, you create the user interfaces for operation and
monitoring of the technical process by using a PC on which is installed COMBIVIS
studio HMI development environment. Configuration also includes:
Creating the project.
Saving the project.
Testing the project.
Simulating the project.
After compiling the configuration, you load the project into the C6 HMI / C6 HMI LC
device.
2.11.2
Process management
Process management is a two-way communication between HMI device and PLC.
Summary of Contents for COMBICONTROL C6 HMI
Page 1: ...Document Part Version 20125246 GBR 00 C6 HMI C6 HMI LC Instruction Manual COMBICONTROL...
Page 2: ...2...
Page 5: ...5 SECTION 1 1 Introductory Information...
Page 10: ...10 SECTION 2 2 Description...
Page 16: ...16 Figure 7 C6 HMI C6 HMI LC 8 4 rear view Aeration holes Mounting seal 1 2 1 2...
Page 25: ...25 SECTION 3 3 Installation and connection...
Page 42: ...42...
Page 43: ...43 SECTION 4 4 Commissioning the device...
Page 47: ...47...
Page 48: ...48 SECTION 5 5 Commissioning a project...
Page 67: ...67 SECTION 6 6 Maintenance...