80
Table 37
10.1”W Display characteristics
Table 38
10.4” Display characteristics
Table 39
12.1” (SVGA) display characteristics
7.1.5
10.1”W Display characteristics
10.1”W Display characteristics
Dimensions
10.1”W (16:10)
Technology
TFT active matrix
Display area
216.96 x 135.6
Resolution
1280 x 800 pixel
Display color
16M colors
Pixel Pitch
0.1695 (W) x 0.1695 (H) mm
Brightness
400 cd/m
2
Horizontal angle
(left + right)
85
◦
+ 85°
Vertical angle
(up + down)
85
◦
+ 85°
Contrast ratio
800:1
Response time (increasing)
25 ms
Backlight
LED
LED life (Note 2)”
100.000h
7.1.6
10.4” Display characteristics
10.4” Display characteristics
Dimensions
10.4” (4:3)
Technology
TFT active matrix
Display area
211.2 (W) x 158.4 (H) mm
Resolution
800 x 600 pixel
Display color
16M colors
Pixel Pitch
0.264 (W) x 0.264 (H) mm
Brightness
400 cd/m
2
(Note 1)
Horizontal angle
(left + right)
80
◦
+ 80°
Vertical angle
(up + down)
60
◦
+ 80°
Contrast ratio
700:1 (Type)
Response time (increasing)
20 ms (Type)
Backlight
LED
LED life (Note 2)”
50.000h @ default (Note 3) and max. Tamb
7.1.7
12.1” (SVGA) display characteristics
12.1” Display characteristics
Dimensions
12.1” (4:3)
Technology
TFT active matrix
Display area
246.0 (W) x 184.5 (H) mm
Resolution
800 x 600 pixel
Display color
16M colors
Pixel Pitch
0.3075 (W) x 0.3075 (H) mm
Brightness
500 cd/m
2
(Note 1)
Horizontal angle
(left + right)
80
◦
+ 80°
Vertical angle
(up + down)
70
◦
+ 70°
Contrast ratio
800:1 (Type)
Response time (increasing)
4 ms (Type)
Backlight
LED
LED life (Note 2)”
100.000h @ default (Note 3) and max. Tamb
Summary of Contents for COMBICONTROL C6 HMI
Page 1: ...Document Part Version 20125246 GBR 00 C6 HMI C6 HMI LC Instruction Manual COMBICONTROL...
Page 2: ...2...
Page 5: ...5 SECTION 1 1 Introductory Information...
Page 10: ...10 SECTION 2 2 Description...
Page 16: ...16 Figure 7 C6 HMI C6 HMI LC 8 4 rear view Aeration holes Mounting seal 1 2 1 2...
Page 25: ...25 SECTION 3 3 Installation and connection...
Page 42: ...42...
Page 43: ...43 SECTION 4 4 Commissioning the device...
Page 47: ...47...
Page 48: ...48 SECTION 5 5 Commissioning a project...
Page 67: ...67 SECTION 6 6 Maintenance...