- 11 -
24.
Assemble
tile course 6
in adhesive. Make sure that
the hole for the damper shaft is in the right place.
25.
Now the flue gas damper (consisting of a damper
box and a damper blade) and the chimney connection
sleeve have to be installed.
Begin by applying silicone (red) around the edge of the
damper box's underside. Then assemble the damper box,
including damper blade, on top of the plate cover. The
damper blade must stand on its three edges inside the
damper box. Check the joint is sealed all round.
Also check that the damper shaft is unobstructed in the tile
hole and that it is possible to open and close the damper.
For top connection, install the chimney connection sleeve
with silicone (red). Check the joint is sealed all round.
Then follow the chimney's installation instructions.
For rear connection, see step 26.
23.
Assemble
tile course 5
in adhesive.
A
B
A
B
Tile course 5
Tile course 5
Tile course 6
Tile course 6
Summary of Contents for Christineberg
Page 1: ...Christineberg Installation Instructions Care and firing instructions ...
Page 19: ......
Page 20: ...01 03 2012 www keddy se ...