6. Engine Removal;Inspection & Installation
6-46
9.
Vice shaft combination decomposition remove check
According to the list of instructions on the order
1 Into reverse components
6 Bridge active tooth
2 Sliding set of 2
7 washer
Φ
26*
Φ
35*1.5
3 washer
Φ
23.5*
Φ
33*1
8 Low block gear components
4 Sliding set of 1
9 washer
Φ
26*
Φ
35*1
5 C form block circle
10 countershaft
9.1wheel gear check up
9.1.1.
Check the vice shaft gear tooth surface five have
crack, pitting corrosion defects, such as a crack,
pitting
the serious gear replacement or vice axis.
9.1.2The reverse gear components and low gear
components contains copper sets, such as copper set of
severe worn, within the prescribed scope is replaced
copper or a gear.
Inner diameter standards into reverse
:
23.52-23.541
mm
Low gear inner standard
:
26.02-26.041 mm
Summary of Contents for 500ATV
Page 1: ...Service Manual 500ATV 500ATV 2 4 4 ...
Page 16: ...1 SERVICE INFORMATION 1 14 ...
Page 17: ...1 SERVICE INFORMATION 1 15 1 ...
Page 18: ...1 SERVICE INFORMATION 1 16 ...
Page 32: ...2 Vehicle body Muffler 2 14 Visible Parts ...
Page 53: ...4 COOLING SYSTEM 4 7 Cooling System Chart 4 ...
Page 63: ...6 Engine Removal Inspection Installation 6 1 Wu Yang 500 CC engine maintenance manual 6 ...
Page 71: ......
Page 72: ......
Page 73: ...6 Engine Removal Inspection Installation 6 11 Engine information 6 ...
Page 190: ...11 BATTERY CHARGING SYSTEM 11 9 Layout for All Electricity Equipment in Vehicle ...
Page 192: ...12 IGNITION SYSTEM 12 2 Ignition System Diagram ...
Page 200: ...12 IGNITION SYSTEM 12 10 Layout for Ignition System Equipment in Vehicle ...
Page 212: ...13 Lighting Instruments Switches 13 12 500ATV Circuit Diagram ...