6. Engine Removal;Inspection & Installation
6-52
11. The left of the assembly.
1. According to the list, as shown in the assembly sequence
1
Left the components
22 O-ring
Φ
2.5*
Φ
27
2 oil
seal
Φ
35*
Φ
48*8 23 O-ring
Φ
3*
Φ
16
3
Check valve components
24 taper washer
4 check
valve
spring
25
With the lock flange surface nut M16
torsion 80N.m
5 Al
washer
Φ
12*
Φ
18*1.5
26 Points oil cover plate MATS
6
Hexagon flange bolts M12*12
torsion 30N.m
27 Points oil cover plate
7 ball-bearing
6207
28
Oil pump assembly
(
See also
Oil pump assembly
explain
)
8
Bevel gear positioning sets
29
Hexagon flange bolts M6*45
torsion 10N.m
9 output
shaft
30
Hexagon flange bolts M6*50
torsion 10N.m
10
Bevel gear positioning sets
31 filter opening
gasket
11 driven
bevel gear
32 Oil absorption plate assemblies
12 ball-bearing
6205
33
Hexagon flange bolts M6*16
torsion 10N.m
13
front bearing retainer
34 washer
Φ
6*
Φ
19*1.5
Summary of Contents for 500ATV
Page 1: ...Service Manual 500ATV 500ATV 2 4 4 ...
Page 16: ...1 SERVICE INFORMATION 1 14 ...
Page 17: ...1 SERVICE INFORMATION 1 15 1 ...
Page 18: ...1 SERVICE INFORMATION 1 16 ...
Page 32: ...2 Vehicle body Muffler 2 14 Visible Parts ...
Page 53: ...4 COOLING SYSTEM 4 7 Cooling System Chart 4 ...
Page 63: ...6 Engine Removal Inspection Installation 6 1 Wu Yang 500 CC engine maintenance manual 6 ...
Page 71: ......
Page 72: ......
Page 73: ...6 Engine Removal Inspection Installation 6 11 Engine information 6 ...
Page 190: ...11 BATTERY CHARGING SYSTEM 11 9 Layout for All Electricity Equipment in Vehicle ...
Page 192: ...12 IGNITION SYSTEM 12 2 Ignition System Diagram ...
Page 200: ...12 IGNITION SYSTEM 12 10 Layout for Ignition System Equipment in Vehicle ...
Page 212: ...13 Lighting Instruments Switches 13 12 500ATV Circuit Diagram ...