6. Engine Removal;Inspection & Installation
6-55
12. The left of the assembly.
According to the list, as shown in the assembly sequence
12.1 The driven shaft assembly instructions
According to the list, as shown in the assembly sequence
1 washer
Φ
15*
Φ
36*2 6
reverse gear shaft
(see the reverse shaft assembly
instructions)
2 Shift drum assembly
7
Hexagon flange bolts M8*32
torsion 30N.m
3 washer
Φ
32*
Φ
40*2 8
drive
shaft
9
O-ring
Φ
2*
Φ
10
4
Deputy shaft combina
(see vice shaft assem
instructions)
5
The driven shaft combina
(see from the shaft assem
instructions)
(see Z-09
outfit that)
6
Summary of Contents for 500ATV
Page 1: ...Service Manual 500ATV 500ATV 2 4 4 ...
Page 16: ...1 SERVICE INFORMATION 1 14 ...
Page 17: ...1 SERVICE INFORMATION 1 15 1 ...
Page 18: ...1 SERVICE INFORMATION 1 16 ...
Page 32: ...2 Vehicle body Muffler 2 14 Visible Parts ...
Page 53: ...4 COOLING SYSTEM 4 7 Cooling System Chart 4 ...
Page 63: ...6 Engine Removal Inspection Installation 6 1 Wu Yang 500 CC engine maintenance manual 6 ...
Page 71: ......
Page 72: ......
Page 73: ...6 Engine Removal Inspection Installation 6 11 Engine information 6 ...
Page 190: ...11 BATTERY CHARGING SYSTEM 11 9 Layout for All Electricity Equipment in Vehicle ...
Page 192: ...12 IGNITION SYSTEM 12 2 Ignition System Diagram ...
Page 200: ...12 IGNITION SYSTEM 12 10 Layout for Ignition System Equipment in Vehicle ...
Page 212: ...13 Lighting Instruments Switches 13 12 500ATV Circuit Diagram ...