Installation Guide for
HOT DRAFT®
https://kegco.com/pages/patents
8510 Miralani Dr.
San Diego, CA 92126
(888) 980 - 4810
support@kegco.com
11
4.
Feed the air-cooling line up into the tower.
5.
Install the Power Cable Strain Relief Clamp. (a) Slip the Clamp around the power cable. (b) Pinch the ends of the Strain
Relief Clamp close together. (c) Align the holes with the back right Tower Screw. (d) Use the provided nut and washer
to tighten the clamp. (e) Use an appropriate wrench to further tighten the nut and washer until the clamp is shut,
shown in (f).