Installation Guide for
HOT DRAFT®
https://kegco.com/pages/patents
8510 Miralani Dr.
San Diego, CA 92126
(888) 980 - 4810
support@kegco.com
28
Flow rate is adjusted by using a flathead screwdriver to tighten or loosen the flow adjustment spindle, as shown below.
To increase the flow rate, loosen the flow adjustment spindle by turning counterclockwise. To decrease the flow rate,
tighten the flow adjustment spindle by turning clockwise, as shown below.
After adjusting the flow adjustment spindle, check the flow rate by plugging in the unit, navigating to “FLOW” in the
service menu, and opening the hot beverage faucet to pour a beverage. Adjust the flow rate until you are at the
recommended value corresponding to your electrical system according to the table on page 26. ENSURE THE UNIT IS
UNPLUGGED AND TURNED OFF BEFORE REACHING INSIDE THE UNIT. When finished, re-attach the lid before operating
the Hot Draft® Tower.