Installation Guide for
HOT DRAFT®
https://kegco.com/pages/patents
8510 Miralani Dr.
San Diego, CA 92126
(888) 980 - 4810
support@kegco.com
20
Voltage Setting Configuration
The HOT DRAFT® Tower will be operable on either 208V, 220V, or 240V electrical systems. Contact a licensed and
qualified electrician to
confirm your installation location’s voltage supply. The unit must
be configured for your specific
voltage supply. Configure the unit by setting a DIP Switch located inside the unit, behind the Control Panel. The lid must
be removed to access the DIP Switches. DO NOT ATTEMPT TO INSTALL, REPAIR, OR DISASSEMBLE THIS WATER HEATER
WITHOUT FIRST SHUTTING OFF ALL POWER TO THE UNIT DIRECTLY AT THE FUSE OR BREAKER BOX.
1.
Remove the lid by removing 4 screws, circled in red below. Lift the lid to open the HOT DRAFT® Tower. The Control
Board will now be accessible. It is located behind the Control Panel, as shown below.