Installation Guide for
HOT DRAFT®
https://kegco.com/pages/patents
8510 Miralani Dr.
San Diego, CA 92126
(888) 980 - 4810
support@kegco.com
25
POURING WITH YOUR HOT DRAFT® TOWER
(a) While idle, t
he Main Screen will display “
On
Demand
”, indicating that your Hot Draft® Tower is
ready for operation.
(b) Open the Hot Draft® Faucet to begin heating your
beverage. The Main Screen will display the messages
“Please Wait…” and “Unit Heating”. This indicates that
your Hot Draft® Tower is heating the beverage up to
the setpoint temperature. Keep the faucet open while
the unit is heating the beverage. Heating may take up
to 10 seconds.
(c) The Hot Draft® Tower will begin dispensing your
heated beverage from the Hot Draft® Faucet when the
beverage is within 15°F of the setpoint temperature.
The Main Screen will display the message “Pouring”.
At least a 12 oz pour is recommended to reach a
consistent in-cup temperature.