BrewZilla 35L - Gen 4 Instruction Manual
Page
23
of
31
Last Updated 22/03/2022 16:53 PM
3.
Go to the
Troubleshooting
tab
4.
Click the
Reset Device Authentication
button.
5.
When prompted, enter the new Validation Code that was generated on the BrewZilla
Controller and click
Save
. Your BrewZilla should now be registered successfully.
If you are still experiencing issues, please contact beer@kegland.com.au for further
assistance
Calibration
If you find that your temperature probe is not reading the correct temperature for example
if is reading over 100°C when boiling at sea level then a 2-point calibration can be
performed.
To enter 2-point calibration mode press
Select
on the device and enter the
Settings
menu.
Then select
2 point calibration.
Then fill your boiler with ice water and measure the
temperature of the water using a calibration thermometer. Wait for the ADC reading to
stabilise as much as possible and input the measured temperature of Calibration point: 1 by
using the up or down arrows. Then press
Select
to set the temperature and ADC reading of
Calibration point 1.
The controller will then move on to Calibration point 2. Empty the boiler and fill with hot or
boiling water. Wait for the ADC reading to stabilise as much as possible and input the
measured temperature of Calibration point: 2 by using the up or down arrows. Then press
Select
to set the temperature and ADC reading of Calibration point 2.
Your brewery should then be calibrated.
Please note if you are above sea level you may find that water reaches a boil before 100°C
and if this occurs calibration may not be required. Refer to the boiling point of water at your
elevation.