background image

IceMaster G40.1 – Glycol Chiller/IceBank Instruction Manual  

 

Page 

2

 of 

10

 

www.KegLand.com.au 

Last Updated 29/07/2020 2:58 PM

 

 

 

 

 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

WARNING

 

IF THE GLYCOL CHILLER HAS JUST BEEN MOVED DO TURN ON UNLESS THE 

GLYCOL CHILLER HAS BEEN STANDING UPRIGHT FOR 24 HOURS. FAILURE 

TO DO SO WILL VOID WARRANTY. STAND THE GLYCOL CHILLER IN THE 

UPRIGHT POSITION FOR 24 HOURS BEFORE PLUGGING INTO THE MAINS 

SOCKET 

WARNING

 

PERFORM A PRESSURE TEST ON ALL PRODUCT LINES PRIOR TO USE 

WARNING

 

ENSURE THAT THERE IS ALWAYS ATLEAST 100mm OF CLEARANCE ON EACH 

SIDE OF THE GLYCOL CHILLER TO ALLOW ADEQUATE AIRFLOW. NOT 

ALLOWING ADEQUATE VENTILATION WILL REDUCE PERFORMANCE, 

INCREASE POWER CONSUMPTION AND VOID WARRANTY 

WARNING

 

DO NOT RUN THE PUMPS DRY. ENSURE THE PUMPS ARE ALWAYS 

SUBMERGED WHEN IN OPERATION. RUNNING DRY CAN DAMAGE THE 

PUMPS 

WARNING

 

ALWAYS HAVE THE AGITATOR PUMP RUNNING. IF THE RESERVOIR FREEZES 

IT CAN RESULT IN DAMAGE OCCURING TO THE COOLING COILS. 

Summary of Contents for IceMaster G40.1

Page 1: ...ycol Chiller IceBank Instruction Manual Page 1 of 10 www KegLand com au Last Updated 29 07 2020 2 58 PM IceMaster G40 1 Glycol Chiller IceBank Instruction Manual KL04114 KegLand Distribution PTY LTD w...

Page 2: ...INTO THE MAINS SOCKET WARNING PERFORM A PRESSURE TEST ON ALL PRODUCT LINES PRIOR TO USE WARNING ENSURE THAT THERE IS ALWAYS ATLEAST 100mm OF CLEARANCE ON EACH SIDE OF THE GLYCOL CHILLER TO ALLOW ADEQU...

Page 3: ...d the IEC cable for the agitator pump and glycol reservoir access flap Run the IEC cable for the agitator pump through the cable outlet and plug it into the external socket as shown to the right Attac...

Page 4: ...mum of 1 hour before turning it on to allow the refrigerant to settle After getting your G40 setup firstly perform a leak test and cooling test on your system to ensure that all connections are water...

Page 5: ...ith a duotight Plug Step 4 Set the pressure on the regulator to 1 5 times the dispensing pressure up to a maximum of 50 psi Step 5 Turn the gas cylinder off and leave to sit for a few hours Then check...

Page 6: ...th the G40 unplugged fill the reservoir with 20L of water ensuring that all cooling coils and the impeller of the agitator pump are submerged Step 2 Attach 10mm ID silicone tube to the Water Out barb...

Page 7: ...ed set temperature of the reservoir which is dependent on a number of factors including heat ingress into the entire system insulation of the glycol lines ambient temperature the number of kegs being...

Page 8: ...erving temperature A single pass through the G40 will be able to drop the temperature of the product by 15 C hence if the storage temperature of the keg is more than 15 C above the desired serving tem...

Page 9: ...of the beverage line between the G40 and the tap Alternatively if the pour is too slow then decrease the length of the beverage line between the G40 and the tap When adjusting your beverage line leng...

Page 10: ...rvoir 6 Attach 10mm ID silicone tube to the Water Out barb and connect this silicone tube to the adjacent Water in barb Run the agitator continuously to keep the reservoir agitated and prevent the res...

Reviews: