Figure3-5
Lift transportation
3.4 Unpacking
For the package is large, please select the package site in advance. In principle, the package site
should be as close as possible to the installation site.
Step 1
Check if the package appearance is in good condition and if there has any transportation damage. If
any damage, please inform the carrier immediately.
Step 2
Transport the PCS to assigned site.
To avoid toppling over during transporting, we do some special design for the wooden bracket. When
transporting by motor-driven forklift or manual forklift, insert the forklift arm form the FRONT of
the wooden bracket, as shown in Figure3-6.