6 Routine Maintenance
Power Conversion System BCS-B-H Series (1000K-1500K)
User Manual
66
All rights reserved © Kehua Data Co., Ltd.
NO.
Checking items
Cycle
9
Inflammable gas alarm
Yearly
10
Smoke detector and heat detector and auto alarm device
Yearly
11
Grounding and ground connection resistance test
Yearly
12
Dust grain density measuring
Yearly
6.1.2 Preventive Maintenance
To improve the operate efficiency and reliability of the equipment; perform the following
maintenance tasks on a quarterly basis.
Table6-2
Maintenance list
Item
Check method
Period
Save the data
of software
1.
Read the data on screen.
2.
Save the history power, history log, fault wave and energy
data to USB disk.
3.
Check the parameters setting.
Every month
System
running status
and
environment
1.
Check the PCS and see if it is damaged or transformation.
2.
Listen the running voice of the PCS and see if it sounds
normal.
3.
Check the work status of the PCS and see if the status is
normal.
4.
When running, check the running parameters.
5.
Check the key component and see if they are normal.
6.
Check the heat of the outer cabinet by thermal imager and see
if the heat is normal and monitor the system's heating
condition.
7.
Observe if the air inlet and outlet is normal.
8.
Check if the humidity and dust around the PCS is normal.
Every half year
Summary of Contents for BCS-B-H Series
Page 1: ...Power Conversion System BCS B H Series 1000K 1500K User Manual...
Page 2: ......
Page 96: ...4402 02858 005...