6 Routine Maintenance
Power Conversion System BCS-B-H Series (1000K-1500K)
User Manual
68
All rights reserved © Kehua Data Co., Ltd.
Item
Check method
Period
fans
3.
Check if there is any abnormal vibrating noise on fan when
running.
Note: if the fan is abnormal, please replace it in time, which is
avoid the PCS fault caused by over-temperature.
Component
maintenance
1.
Check if all the metal component without rust.
2.
Check the contactor (auxiliary switch and micro breaker) and
keep them operate in good condition.
3.
Check the running parameters.
Every half to
one year
Safety
function
1.
Check the EPO button and see if it stay in normal status.
2.
Imitate power off operation, check if the communication
signal of power off is normal.
3.
Check if the warning labels and other device labels on the
PCS are damaged or obscure, if yes, please replace them in
time.
Every half to
one year
Software
maintenance
1.
Optimize the software.
2.
Check the parameters setting.
Every half to
one year
Time display
1.
Check the displayed time on screen and see if it is exact.
2.
If not exact, calibrate the time according to Screen setting in
. After setting, if the displayed time still
not in accordance with the actual time, please check the
replace the fastener battery at the back of the screen.
Every one and
a half year
Most maintenance needs to dismantle the inner protection filter, please restore the protection filter
after maintenance and ensure all screws are fastened.
Summary of Contents for BCS-B-H Series
Page 1: ...Power Conversion System BCS B H Series 1000K 1500K User Manual...
Page 2: ......
Page 96: ...4402 02858 005...