3 Installation
Hybrid Inverter
User Manual
44
2.
Set the "Anti-backflow control power" in "Basic setting" according to the actual use (the setting
value of anti-backflow control power is percentage, it is corrected by rated power. For example,
when the rated power of the inverter is 5kW, if the zero-export power set to 30%, the set
anti-backflow control power is 1.5kW).
Figure3-55 Set "Anti-backflow control power"
The pin illustration of smart meter is as shown in Step 1 and Table3-5.
Table3-4 Pin illustration of smart meter (single phase)
Pin
Illustration
3
Connect to phase-L of GRID port in the inverter and phase-L of grid output.
4
Connect to phase-N of GRID port in the inverter and phase-N of grid output.
5
Connect to I+ port of current transformer in the meter.
6
Connect to I- port of current transformer in the meter.
24
RS485: A. Connect to RJ45's pin6 of communication port in the inverter.
25
RS485: B. Connect to RJ45's pin5 of communication port in the inverter.
Zero-export control power (%)