Hybrid Inverter
User Manual
4 APP Operation
73
Figure4-36 Battery backup power setting
Grid Meter Setting
If the meter cannot operate normally after connection and setting, please contact the installer to set the
baud rate and address of the meter.
The setting is in the operation & maintenance authority and needs to be set by installer. The setting
procedure is as follows.
Please use the configured meter by our company, or the protocol does not support and cannot be
used.
Step 1 Set the meter type in "
Basic setting
-
grid meter
", as shown in Figure4-37.