3 Installation
MY-A Series (10kVA-20kVA) UPS
User Manual
30
Figure3-5
Outer dimensions (unit: mm)
Step 2
Drill 4φ10 holes on the ground by impact drill according to the installation holes size of pedestal, as
shown in Figure3-6 (drilling deviation ±2mm). Install expansion bolts M8. The structure and
installation for the expansion bolt is as shown in Figure3-7.
Figure3-6
Installation holes size of pedestal (bottom view, unit: mm)