String PV Grid-tied Inverter SPI-B-H Series (175K-250K)
User Manual
3Installation
All rights reserved ©Kehua Hengsheng Co.,
Ltd.
21
Figure3-8
Installation carrier requirements
3.4 Handling, Unpacking and Checking
3.4.1 Handling
Before installation, the inverter needs to be transported to the selected installation site. When
transporting, you can choose to carry the handle or the ring according to the scene.
Handle
Figure3-9
Curry by handle
The handle is a random accessory. When transport the inverter by handle, it needs to be installed the
handle in the corresponding position and tightened before lifting.
It is recommended that at least 4 people carry the inverter together and wear protective equipment
such as smash-proof shoes and gloves.
Summary of Contents for SPI-B-H Series SPI175K-B-H
Page 1: ...String PV Grid tied Inverter SPI B H Series 175K 250K User Manual...
Page 2: ......
Page 71: ...4402 00000001...