3Installation
String PV Grid-tied Inverter SPI-B-H Series (175K-250K)
User Manual
18
All rights reserved ©Kehua Hengsheng Co.,
Ltd.
Figure3-2
Installation environment requirements
As the operation of inverter will produce noise pollution, thus avoid installing them near
residential areas as much as possible.
Choose the best installation location for the inverter, which plays a very important role in its safe
operation, service life, performance guarantee, etc. Therefore, it is recommended to choose a location
that can avoid direct sunlight, rain, and snow. As shown in Figure3-3.
Figure3-3
Recommended installation location
3.3.2 Installation Clearance
Keep a clearance of at least 800mm from the left side and right side of inverter to other objects, at
least 600mm from the top of inverter to ceiling and at least 450mm from the bottom of inverter to
ground, which is good for heat dissipation or maintenance, as shown in Figure3-4.