Model 2461 Interactive SourceMeter® Instrument Reference Manual
Section 7: Introduction to TSP operation
2461-901-01 A/November 2015
7-37
4. In the
Name
box, enter the name of your new run configuration.
5. Click the
Browse
button next the Project box.
6. Select a project from the list of available projects
7. Click
OK
.
Figure 168: Project Selection dialog box
The TSP files for the selected project are added to the Available Project Files list on the Main tab.
Figure 169: Available files for selected project