Page 1: ...c i a n sw i t ho v e r 1 5 0y e a r so f s p e c i a l i z a t i o n 9 0d a yw a r r a n t y 5d a yr i g h t o f r e t u r no na l l e q u i p me n t 1 3y e a r w a r r a n t i e sf o r n e wa n d p...
Page 2: ...able setup It is also used with the Keithley Model 4200 PIV A package to perform pulse I V measurements This kit has been assembled for use with the Suss Micro Tec PA200 300 prober series NOTE For C V...
Page 3: ...PA200 300 series prober A photo shows all the components of the cable kit PA 994 This is a one page packing list for the Model 4210 MMPC C Multi Measurement Prober Cable Kit for the Cascade MicroTech...
Page 4: ...s two Model 4200 SMU prober connections NOTE Figure 3 shows SMUs that do not use preamps These SMUs use the supplied triax cables that are terminated with a miniature triax connector on one end and a...
Page 5: ...and other components Use the supplied cables and connectors to connect the Model 4200 to the bulkhead of the prober see Figures 5 and 6 Figure 5 shows the Model 4200 connections to the prober and the...
Page 6: ...Model 4210 MMPC S Quick Start Guide PA 1000 Rev B January 2010 5 Figure 5 Model 4200 PIV A instrumentation connections Figure 6 Cables and adapters used for instrumentation connections...
Page 7: ...setup which is more complex is described later in this quick start guide Figure 7 Basic 2 pin prober cable setup Installation guidelines Figure 8 shows the prober cable assemblies of two Model 4200 M...
Page 8: ...od practice to install the second jumper It not only improves the connection but it is a good place to store the extra jumper Figure 9 shows another view of the jumper Figure 9 Front view of the insta...
Page 9: ...m 2 pin I V testing Figure 3 shows the SMU connections to the outside of the bulkhead Figure 10 Test setup for 2 pin I V testing I V testing 4 pin I V setup With four Model 4200 SMUs connected to the...
Page 10: ...pin C V setup NOTE The setup for 2 pin C V testing requires two prober cable kits With a Model 4210 CVU connected to the prober bulkhead use the fundamental setup shown in Figure 12 to perform 2 pin...
Page 11: ...s a factory installed package that includes a scope card pulse generator card software and other components to perform 4 pin pulse I V measurements The test setup for using the Model 4200 PIV A is sho...
Page 12: ...Model 4210 MMPC S Quick Start Guide PA 1000 Rev B January 2010 11 Figure 14 Connections to the gate and source of the DUT Figure 15 Connections to the drain and bulk Figure 16 Jumper connections...