Source-Measure Concepts
5-7
The manually set delay (up to 9999.999 sec) is available to compensate for longer settling
required by external circuitry. The more capacitance seen at the output, the more settling time is
required for the source. The actual delay period needed can be calculated or determined by trial
and error. For purely resistive loads and at higher current levels, the programmable delay can
be set to 0msec.
The measure time depends on the selected measurement speed. For example, if speed is set
at 0.01 PLC (power line cycles), the measure time would be 167µsec for 60Hz operation
(0.01/60).
Arm
Layer
Trigger
Layer
Event
Event
:idle
Trig
Trig
S D M
Source Delay Measure
See Section 11
for trigger model details.
Figure 5-2
Simplified
trigger model
Summary of Contents for 6430
Page 26: ......
Page 32: ......
Page 78: ...2 14 Connections ...
Page 98: ...3 20 Basic Source Measure Operation ...
Page 138: ...5 30 Source Measure Concepts ...
Page 156: ...6 18 Range Digits Speed and Filters ...
Page 168: ...7 12 Relative and Math ...
Page 176: ...8 8 Data Store ...
Page 202: ...9 26 Sweep Operation ...
Page 248: ...11 22 Limit Testing ...
Page 310: ...16 6 SCPI Signal Oriented Measurement Commands ...
Page 418: ...17 108 SCPI Command Reference ...
Page 450: ...18 32 Performance Verification ...
Page 477: ...A Specifications ...
Page 489: ...B StatusandErrorMessages ...
Page 498: ...B 10 Status and Error Messages ...
Page 499: ...C DataFlow ...
Page 503: ...D IEEE 488BusOverview ...
Page 518: ...D 16 IEEE 488 Bus Overview ...
Page 519: ...E IEEE 488andSCPI ConformanceInformation ...
Page 523: ...F MeasurementConsiderations ...
Page 539: ...G GPIB488 1Protocol ...
Page 557: ......