Section 2: S530 site preparation and installation
S530 Parametric Test System Administrative Guide
2-10
S530-924-01 Rev. D / September 2017
12. Remove the tape from the packing material using scissors, taking care not to scratch the S530
system cabinet.
Figure 16: Cutting the wrap off the system
13. Move the S530 system cabinet to its final destination.
The system cabinet is shipped from the factory with all of the instruments installed. Most equipment
connections and wiring of instruments in the system cabinet was done at the factory.
Unpacking the S530 system accessories
The accessories are shipped in a separate box (note there may be more than one depending on how
many accessories are ordered).
Figure 17: S530 system accessories