Section 4: Maintenance
S530 Parametric Test System Administrative Guide
4-6
S530-924-01 Rev. D / September 2017
Power distribution and emergency off
The following figure contains a simplified example layout of various components in the S530 system
(the LO patch panel and the interlock are shown for reference only; they are behind the
source-measure units (SMUs)).
Figure 42: S530 system cabinet rear view