Performance Veri
fi
cation
This section contains performance veri
fi
cation procedures for the speci
fi
cations
marked with the
symbol. Additional test equipment is required to complete the
veri
fi
cation procedures. (See Table 27 on page 24.)
These procedures cover all models of the Series 2200 Programmable DC Power
Supplies. Ignore checks that do not apply to the speci
fi
c model you are testing.
Print the test record on the following pages, and use it to record the performance
test results for your power supply.
NOTE.
Each individual performance test must be done for each channel. This
means two times for the 2220-30-1 and 2220J-30-1. It means three times for
the 2230-30-1 and 2230J-30-1.
NOTE.
Completion of the performance veri
fi
cation procedure does not update the
stored time and date of the latest successful adjustment. The date and time are
updated only when the factory adjustment procedures are successfully completed.