12
Kekkilä Composting Dry Toilet
EN
Installation
The Kekkilä Composting
Dry
Toilet may be installed in an existing or new building. Remember to ensure that
at least 500 mm of free space remains underneath the toilet building, because the Kekkilä Composting
Dry
Toilet is installed through the floor of the building, and the sitting height is 425 mm.
1. Ensure that the package contents are as listed, and acquire a sufficiently long air-ventilation pipe (diameter: 75 mm;
length: one metre from the toilet body to above the ridge of the building).
2. Prepare a level load-bearing foundation underneath the toilet body. We recommend installing the body, for
example, on top of 50 mm lightweight breeze blocks, placed over a frost-resistant ballast bed. This ensures steady
installation of the toilet and facilitates emptying. Ensure again that there is 500 mm of free space below the floor.
3. Use the included template to outline the aperture on the floor of the toilet building. Use a coping saw to cut along
the lines.
4. Detach the emptying hatch from the toilet body, and embed the body in its place. The skirt of the toilet body hides
any unevenness created during the sawing.
5. Attach the emptying hatch in its place at the back.
6. By hand, fasten the hose, seepage strainer spindle and pre-attached overflow hose tightly onto
the toilet body, and guide the overflow hose into the seepage canister, which must be placed in
a hole dug in the ground. NOTE: Overflow liquids must not be drained directly into the ground!
7. Install the ventilation pipe (not included) in the connection on top of the toilet. The pipe must
be led through the ceiling and must reach one metre above the ridge of the building. The pipe
lead-through should be sealed carefully, to prevent water leaks. Suitable pipe package´s pipe
dimension is 75 mm. 75 mm pipe shall be installed on top of the adapter, not around it. The
compatibility of the toilets and pipes vary, and the installation might be a bit loose. This does not
affect the air ventilation or cause odor problems. Installation may be secured by: saw around 7
cm piece of the pipe, connect it to the adapter end of the pipe and connect this end of the pipe
to the dry toilet´s air ventilation adapter.
8. Attach the included ventilation pipe cap to the end of the pipe. It prevents rain and insects from
entering the toilet.
9. Put the thermal seat in place.
Before use
Use of the Kekkilä Composting
Dry
Toilet does not require complex preparations. Make a layer
of approximately 5 cm of rough branch chips or twigs. This prevents the overflow connection from
clogging. Ensure that the emptying hatch is tightly closed and that the overflow hose is attached to
the hose spindle and leads to the seepage canister, so that the liquids cannot be absorbed directly into the soil.
Operation
The Kekkilä Composting
Dry
Toilet does not need any external energy to operate. The composting is a natural process
that the heat insulation of the composting toilet makes more efficient. In addition, the liquids seeping through the material
maintain the moisture needed for the composting process.
The Kekkilä Composting
Dry
Toilet is nearly as easy to operate as a water toilet. However, the waste must be covered
with desiccant after each use. Use approximately 2–5 dl of desiccant at a time. To ensure correct consistency, nitrogen
balance, and therefore efficient composting by the toilet, we recommend using Kekkilä Desiccant for Dry Toilets.
Always close the thermal toilet seat lid after use, to guarantee proper ventilation of the toilet and avoid unpleasant
odours.
Summary of Contents for EKO 230L
Page 1: ...Tehok ym l 230 L EKO Komposterande torrtoalett 230 L EKO FI SV EN RU...
Page 14: ...14 RU 4 Kekkila 7 495 795 26 82 1 2 3 4 5 6 7 8 9 10...
Page 15: ...15 RU 1 1 2 1 3 1 4 1 5 1 6 1 7 1 8 2 9 1 10 5 16 2 1 1 1 12 1 425 980 800 600 230 75 1...
Page 16: ...16 RU 500 425 1 75 1 2 500 3 4 5 6 7 1 8 9 2 5 Kekkil Hajusieppo...
Page 17: ...17 RU Globe Thermo 5 10 1 2 1 5 1...
Page 18: ...18...
Page 19: ...19...