14
BROWNOUT OR BLACKOUT
If a blackout or brownout occurs the E30 will not retain any memory of
where in its run or stop cycle it may have been, it will simply shut down the
pump. When power resumes, the E30 will reboot, and under acceptable
pressure conditions, restart the pump and run any timer settings from the
beginning. A manual reboot can be done at any time by pressing and
releasing the E30’s reset button.
CABLES
The E30 has 3 X M20 cable glands. As supplied, the cable glands are
blanked off. To use the glands
fi
rst punch out the blanking barriers using a
suitable punch. The cable glands can accept cable from 7 to 9mm diameter.
See sketch for assembling the cable gland components. The controller is
supplied with a set of steel crimp rings. The crimp rings are to provide
strain relief for the controller’s cables. To use the crimps, place one on the
cable approximately 3 to 4mm below the end to the cable’s outer sheathing.
Crimp the two ears of the ring
fl
at using bull nosed pliers. Pull the cable
back through the cable gland until the crimp ring’s ears are fully located
into the slots in the cable gland housing.
Grommet
Summary of Contents for E30
Page 11: ...11 74mm 60mm 4 X 6mm Holes TOP WALL BRACKET DRILL PATTERN...
Page 19: ...19 WIRING DIAGRAMS PLUG PLAY CONNECTIONS CONNECTIONS FOR A SINGLE PHASE PUMP...
Page 20: ...20 LOW VOLTAGE AC SUPPLY WITH REMOTE INPUT CONNECT AN EXTERNAL ALARM...
Page 21: ...21 TWO SINGLE PHASE PUMPS WITH A REMOTE INPUT LOW VOLTAGE DC SUPPLY REMOTE INPUT...