Installation
Control Hub
Prepare Control Hub for wall mounting. Ensure Hub Clips are all
functional and screw holes are clear.
1
Select the position for the Control Hub referring to the “Siting the
Shower” figure on page 7.
Locate the four screw holes and mark onto wall being drilled.
2
Cover the Control Hub with its lid and secure the fastening clips.
Drill the holes for the screws to go into the wall. Screw them
into place with the Control Hub mounted on the wall using a
screwdriver.
3
4
Remember!
Only use the power supply and electrical connections provided.
Always check for hidden pipes + cables before drilling.
STEP 1
STEP 2
!
Ensure the electrical installations on page 11 are completed and
power is being supplied to the Control Hub PCB, indicated by the
LEDs being lit.
8