11
Electrical Installation
This shower requires a 230-240 VAC, 47 ~ 63Hz single phase supply. A single 3 Amp switched fused spur should be used
for each Panel. Up to 12 Kelda showers can run from a single 32A 30mA RCBO.
Before connecting to power supply, make sure that the mains terminal is able to sustain 240V and 3A. All electrical
installation to be carried out by an approved electrician in accordance with Part “P” U.K. Building Regulations and to the
latest IEEE standards, or the appropriate regulations in the country of installation.
Only the power supply and cables provided by Kelda Showers can be used. Damaged power supplies and cables should
be scrapped, other power supplies or cables cannot be used. Contact Kelda Showers for a replacement.
~~
~~
~~
~~
~~
~~
~~
~~
32A 30mA RCBO
(Up to 12 Showers)
3A Switched Fused Spur
AC 220-240V to DC
24V Transformer 150W
(Supplied)
Control Hub
1.
Thread the power supply cable through the 16mm cable gland
in the bottom left of the Control Hub.
2.
Connect the cable to the 24V power terminal shown. (Polarity
of connections is not important)
3.
Using a 3mm flat screwdriver, tighten the connections down
and tighten gland nut onto cable
Main Distribution Board
230-240V AC
Electrical Connection