background image

6

ASSEMBLY

1.  Prepare the position of the gates on a level surface. Ensure that the ground under the 

selected location is level, and preferably hard-packed so that the feet of the gates cannot 

sink into the ground. Put all material which is to be used for the installation nearby. Check 

that you have all the parts needed for the assembly.

2.  Fit the feet on the legs of the gates (6). The feet with two tubes should be placed at the 

front where the gate doors will be. Bolt the gates onto the stabilisers. Note that the gates 

for the gable are higher than the side gates. Tighten all bolts. Secure the gates in the 

ground with tent pegs/anchors. Drill into the ground if necessary, using a thinner drill 

bit to avoid bending the pegs. IMPORTANT! Tighten all bolts to ensure that they do not 

come undone.

3.  Assemble all arches (3). Fit the arches over the gates, then fit the stabilising struts between 

the arches: 2 on either side and 2 on top between the sections. Secure the arches with 

bolts, and tighten. Fit the gate doors at the front and secure with tubular pipe clamps. 

Summary of Contents for 25-T300K

Page 1: ...READ THE INSTRUCTION MANUAL CAREFULLY BEFORE USING THE PRODUCT OPERATING INSTRUCTIONS TRANSLATED FROM ORIGINAL 25 T300K WIND SHELTER FOR SHEEP...

Page 2: ...product Remember that it may be good for your own and others safety to read the safety information every now and then If the instructions manual is damaged or otherwise unusable please contact your r...

Page 3: ...ructure should be removed immediately in order to prevent the structure from collapsing under the weight 8 Try to keep the structure dry especially along the base This will extend its service life 9 T...

Page 4: ...windy When remov ing the fabric cover ensure that the ropes are removed and that the cover does not get caught on the way down Avoid using heavy equipment to pull off the cover 4 To extend the servic...

Page 5: ...5 PARTS NUMBER Arch 2 part 3 Gate 6 Foot 5 Foot front 2 Door 2 Fabric cover 1 Back wall 1 Anchor 7 Clamps 2 Rope 3 CHECKLIST...

Page 6: ...ront where the gate doors will be Bolt the gates onto the stabilisers Note that the gates for the gable are higher than the side gates Tighten all bolts Secure the gates in the ground with tent pegs a...

Page 7: ...e can help you to guide the cover over the frame from the inside in order to prevent the canvas getting caught on the frame 6 Tension the rope at the front and rear to fix the cover firmly on the fram...

Page 8: ...the design and appearance without notice CUSTOMER SERVICE You are always welcome to give your feedbacks reviews or ask us about our tools and products WARRANTY TERMS AND CONDITIONS Validity of the wa...

Reviews:

Related manuals for 25-T300K