3
INSTALLATION INSTRUCTIONS
TRIPLE FLUE KIT
INSTALLATION TO COMPLY WITH AS/NZS 2918
Stainless steel
double cone cowl
Support outer flue
with bracket supplied
Support outer flue
with bracket supplied
Roof flashing supplied
by contractor
Ceiling line
10”
8”
6”
1000mm minimum
distance above roof line
Vented cap
Ceiling plate
12mm min air gap
between ceiling line
and celling plate
25mm min air gap
B
Trim line
Short tube fits into flue
pipe. All flues should
be trimmed level
Pop rivet or
screw brackets to
the outside of the
outer casing
A
FLAT CEILING
A
Outer casing may be
painted without priming.
Run a bead of silicon down
seam of outer casing to
ensure against leaks. All
casing flue pipes must be
connected via pop rivets
supplied by installer
Stainless steel flue pipe.
All flue pipes must be
connected via pop rivets
supplied by installer
B
150mm min
NOTE:
When decromesh/heatsheild is fitted, it must finish a minimum 600mm below
the ceiling or extend through the ceiling drop box into the outer flue casing.
Always cover flue completely until installation and cleanup is complete.
Summary of Contents for XL
Page 6: ...6 CERTIFICATE GOES HERE ...