4
INSTALLATION INSTRUCTIONS
TRIPLE FLUE KIT
INSTALLATION TO COMPLY WITH AS/NZS 2918
Vented cap
Ceiling plate
12mm min air
gap between
ceiling line and
celling plate
25mm min air gap
B
RAKED CEILING
A
B
Trim line
Short tube fits into flue
pipe. All flues should
be trimmed level
Pop rivet or
screw brackets to
the outside of the
outer casing
A
150mm min
Stainless steel
double cone cowl
Support outer flue
with bracket supplied
1000mm minimum
distance above roof line
Outer casing may be
painted without priming.
Run a bead of silicon down
seam of outer casing to
ensure against leaks. All
casing flue pipes must be
connected via pop rivets
supplied by installer
Stainless steel flue pipe.
All flue pipes must be
connected via pop rivets
supplied by installer
10”
8”
6”
Roof flashing supplied
by contractor
NOTE:
When decromesh/heatsheild is fitted, it must finish a minimum 600mm below
the ceiling or extend through the ceiling drop box into the outer flue casing.
Always cover flue completely until installation and cleanup is complete.
Summary of Contents for XL
Page 6: ...6 CERTIFICATE GOES HERE ...