36
Copyright © 2000 - 2005 KEMP Technologies, Inc. All Rights Reserved.
License keys are linked to LoadMaster hardware and are not transferable.
Once a valid License Key has been input, Quick Setup will be started. For more information on Quick Setup,
please consult the “Quick Setup” section.
C. Initial Setup of a LoadMaster High Availability (HA) Cluster
1. Login and License Key
Enter "bal" for the first login and "1fourall" for the password.
Using a null modem cable connect a PC using terminal emulation software from its COM+ port to the
LoadMaster COM port on the right, note the left COM port will not be used to connect to unit (COM+ settings
should 115200,8,N,1).
Upon successful login a screen will appear with the following message:
"Thank you for purchasing LoadMaster. Please contact your KEMP representative to receive a License Key and
unlock your LoadMaster".
Note down the Access Code and then contact you KEMP representative to get the License Key.
Note: When typing in the License Key, the keyboard has a US/ASCII mapping. The minus (“-“) character on
the numeric keypad will always work when “NumLock” is active.
During Quick Setup, you will be given the opportunity to change this setting to correctly reflect the actual
keyboard layout being used.
Hint: You must have a service agreement or an evaluation window with KEMP Technologies to receive the
Access Code of the LoadMaster.
License keys are linked to LoadMaster hardware and are not transferable.
Once a valid License Key has been input, Quick Setup will be started. For more information on Quick Setup,
please consult the “Quick Setup” section.
2. Configuring the second LoadMaster
Log in on the console of the second machine. Another Access Code will be displayed, obtain a second license
key from your KEMP Representative as before and enter it on the console.
The LoadMaster will then request the local IP address that is to be used on Ethernet eth0 as well as the IP
address of the first machine.
The machine will then transfer the configuration from the first machine. On completion the following message
will be displayed:
“Most of the configuration parameters have been received from the partner LoadMaster.
Only the local network interfaces must now be configured.”
The local network interface addresses must now be input. The common IP address and network are displayed
as a guide.
Once the local interface addresses have been input, the configuration should be activated. The HA cluster is
now configured and ready for work.
If the parameters cannot be received from the partner, the full quick setup procedure must be followed using
the same parameters (except local interface addresses) as on the first LoadMaster.