Haulage
KM00321,0000A7B -19-13MAY20-2/2
Lifting the Header With Optional Lifting Eye Nut Kit
CAUTION: When loading the rotary harvesting unit
with a crane, always use the suspension points.
This prevents the machine from toppling over.
Make sure to use chains and hoisting devices
that meet the weight requirements of the rotary
harvesting unit (see "Specifications" section).
When lifting the header without a traverse, a special kit
is required. This kit is mandatory and consists of two
heavy-duty lifting eye nuts (A).
NOTE: The kit is available through spare parts channel.
Contact your Kemper dealer.
1. Remove the existing lifting eye nuts in the two center
gathering drums and install the heavy-duty lifting eye
nuts (A).
IMPORTANT: The lifting eye nuts (A) must be
screwed in completely. Only tighten the
lifting eye nuts (A) by hand.
2. Lift the header by using chains (B) and (C) with the
relevant length as shown on illustration.
A—Heavy-Duty Lifting Eye
Nuts
B—Chain, 1540 mm (5 ft 0.62
in.)
C—Chain, 1600 mm (5 ft 2.99
in.)
KM380938
—UN—28JUN19
KM380939
—UN—28JUN19
15-2
061721
PN=26
Summary of Contents for 460plus
Page 6: ...Contents iv 061721 PN 4...
Page 108: ...Serial Number 80 2 061721 PN 108...
Page 111: ...Index Index 3 061721 PN 3...
Page 112: ...Index Index 4 061721 PN 4...