26
Measurements
Low voltage and secondary overvoltage watch tests
Tests in the following pages (three tests) have to be done after replacing any primary or secondary
units or cards. It absolutely important because possible short circuit (e.g. improperly installed mica
insulator) may damage the machine heavily.
To execute following low voltage tests, Kemppi Multipower (and wire set) and digital multimeter is
required.
Be very careful and follow the instructions set by step to make everything in right order. Otherwise you
may damage the machine or the testing equipment.
Remember to measure DC-link is not charged while making any connections. In the case it is in high
voltage state you may injure yourself or damage the Kemppi multipower.
Summary of Contents for MasterTig MLS 2300 ACDC
Page 1: ...1 Service manual Mastertig MLS 2300 ACDC Version 1 3 1...
Page 11: ...11 Construction Z004 A004 A002 A001 Z002 Z001 behind the isolator Z003 A003 T001 T002 L001...
Page 12: ...12 Main circuit diagram...
Page 15: ...15 Main circuit card Z001 Connectors X8 X2 X8 Z004 X1 X7 X6 X5 X4 X3 X4 A001...
Page 19: ...19 Secondary rectifier Z002 Connectors X6 X5 X2 X1 X4 X3 X10 X9 X8 X7 X11...
Page 35: ...35 Notes...