R AD AR
49
5. Adjustment
5.1 Crossrail adjustment
X-axis to check deviation direction.
(1) Put the measure tool on Z-axis, and the reading head on the work table. To move
First, check if X-axis is parallel to work table. If not, check the deviation direction of X-axis,
and then adjust.
and right PIN.
(2) After confirm deviation direction, enter crossrail maintenance mode and to out the left
and 20 pcs of M12 screws.
(3) Loosen M12 socket set screws each 2 pcs on the top and down of the left of column,
If any screw is covered, lifting the crossrail to loosen screws.
Don't loosen screws completely, or the parts will fall down.
Right
Left
Work Table
The left low, and the right high
The left high, and the right low
Deviation
2
×
M12 Socket set screw
20
×
M12 Screw
2
×
M12 Socket set screw
Figure 5.1
Figure 5.2
5.
Adjustment
5.
Adjustment
5.
Adjustment
5.
Adjustment
5.
Adjustment
5.
Adjustment
5.
Adjustment
5.
Adjustment
5.
Adjustment
5.
Adjustment
5.
Adjustment
5.
Adjustment
5.
Adjustment
5.
Adjustment
5.
Adjustment
5.
Adjustment
5.
Adjustment
5.
Adjustment
5.
Adjustment
5.
Adjustment
5.
Adjustment
5.
Adjustment
5.
Adjustment
5.
Adjustment
5.
Adjustment
Property
of
Kent
Industrial
USA
Do
Not
Reproduce