R AD AR
54
(4) After the adjustment then tight up 8
×
M30 as Figure 5.8 then you finish the
decide tight up which side of screw set.
(3) Release the upper row 4×M16 screws then according the deviation direction to
(Note: When release or tight up the screw they should do it simultaneous to
avoid the column deviation.)
Z-axis positioning adjustment.
Figure 5.9
If the Z axis needs to be moved
backwards, turn the 2 screws clockwise.
If the Z axis needs to be moved
forward, turn the 2 screws clockwise.
5.
Adjustment
5.
Adjustment
5.
Adjustment
5.
Adjustment
5.
Adjustment
5.
Adjustment
5.
Adjustment
5.
Adjustment
5.
Adjustment
5.
Adjustment
5.
Adjustment
5.
Adjustment
5.
Adjustment
5.
Adjustment
5.
Adjustment
5.
Adjustment
5.
Adjustment
5.
Adjustment
5.
Adjustment
5.
Adjustment
Property
of
Kent
Industrial
USA
Do
Not
Reproduce