background image

KD GEMINI – INSTALLATION/OPERATION MANUAL 

 

KD Gemini

 

 

 

May-06 

4

3.0  INSTALLATION 

 

3.1  IMPORTANT

 

 

Read this installation manual thoroughly before installing furnace or starting burner.  
Consult local authorities about your local Fire Safety Regulations.  All installations must 
be in accordance with local state or provincial codes.  Improper installation will result in 
voiding of warranty. 

 

3.2  CAUTION

 

 

DO

 

NOT

  START THE BURNER UNTIL ALL FITTINGS, COVERS AND DOORS ARE 

IN PLACE.   

DO

 

NOT

 TAMPER WITH THE FURNACE OR CONTROLS CALL A QUALIFIED 

BURNER TECHNICIAN.   

DO

 

NOT

 STORE OR USE GASOLINE OR OTHER FLAMMABLE VAPOURS AND 

LIQUIDS IN THE VICINITY OF THIS OR ANY OTHER APPLIANCE. 

 

3.3  INSTALLATION CODES 

 

INSTALLATION MUST COMPLY WITH THE REQUIREMENTS OF AUTHORITIES 
HAVING JURISDICTION.  All local and national codes governing the installation of oil 
burning equipment, wiring, and venting must be followed.  Use only nozzles and 
settings shown on the operating decal.  Use approved fittings, tubing, fuel tank, oil shut 
off valves, etc.  Some of the applicable codes are: 

 

CAN/CSA B139

 

Installation Code for Oil Burning Equipment. 

 

NFPA 31

 

 

Installation Code for Oil Burning Equipment. 

 

ANSI/NFPA 90B

 

Warm Air Heating and Air Conditioning Systems. 

 

ANSI/NFPA 70

 

National Electrical Code. 

 

CSA C22.1

   

Canadian Electrical Code. 

 

ANSI/NFPA 211

 

Chimneys, Fireplaces, Vents and Solid Fuel Burning Appliances. 

 

The latest versions of the above codes that have been approved for use in the location 
of the installation must be used. 

 
 
 
 
 
 
 
 
 
 

 
 

Summary of Contents for KD Gemini

Page 1: ...AT MAY DIFFER FROM THIS MANUAL Please read this complete manual before beginning installation These instructions must be kept with the furnace for future reference CERTIFIED TO CAN CSA Std B140 0 Std...

Page 2: ...ement Venting Ventilation 5 3 5 Installation 5 3 6 Assemble Install Burner 6 3 7 Changing Nozzle 6 3 8 Set Up Burner For Efficient Operation 7 3 9 Blower Settings 8 3 10 Cooling AC Models 8 3 11 Humid...

Page 3: ...se new approved disposable filters of the same size and type or clean permanent filters according to manufacturer s instructions Replace the filters or clean the filters more often if dusty conditions...

Page 4: ...hat has been shut down for an extended period of time INSPECTION Have the furnace system serviced and inspected by a qualified technician CHECK Furnace system has not been tampered with FUEL ON Turn o...

Page 5: ...ANY OTHER APPLIANCE 3 3 INSTALLATION CODES INSTALLATION MUST COMPLY WITH THE REQUIREMENTS OF AUTHORITIES HAVING JURISDICTION All local and national codes governing the installation of oil burning equ...

Page 6: ...g decal for approved vent flue pipe sizes Maximum flue gas temperature is 575 F THROUGH THE This Furnace is approved for Kerr Direct Vent WALL VENTING COMBUSTION Install openings and ductwork to the f...

Page 7: ...heck for clean seating and tighten in nozzle adaptor CHECK See burner manufacturer s instructions for correct setting ELECTRODES INSERTION See GENERAL SPECIFICATIONS or diagram Figure 1 LENGTH MOUNT B...

Page 8: ...a stable symmetrical flame After 15 minutes of normal operation check SMOKE for 0 trace reading and measure CO2 Re adjust the burner controls as required When the burner is set lock the adjustments wi...

Page 9: ...nty 3 12 THERMOSTAT ANTICIPATOR SETTING Thermostat anticipator setting should be 0 2 amps for any burner Check that the thermostat anticipator setting matches the primary control circuit current draw...

Page 10: ...struction and the heating system tested on a long burn cycle 7 If the block vent switch shuts down the system check to ensure there is enough draft in the chimney and venting pipes 3 14 FAN CONTROL LI...

Page 11: ...tight as possible Use a pipe joint compound suitable for oil on all pipe threads To reduce possibility of air leaks tighten stem packing gland nut on any valves installed in the suction line Also be s...

Page 12: ...5 2 84 0 60 60B 3 5 0 0 88 000 26 850 950 4 3 0 92 3 48 0 75 60W 150 5 0 1 5 105 000 31 1080 1200 3 2 KDF R E 115 A3 Riello 40 F3 1 00 3 81 0 75 60W 175 5 0 1 5 116 000 34 1080 1300 3 1 KDF R E 130 A3...

Page 13: ...2 wc External static AC 0 5 wc Cooling Air Flow 3 tons Maximum air temperature rise 85 F Fan Control 130 F ON 100 F OFF High Limit max design outlet temp 200 F 1 3 hp 1 speed 0 50 static 1300 CFM MOT...

Page 14: ...fied for use with Kerr Direct Vent Certified for use with Kerr KPV SS1C through the wall mechanical vent system 10 0 TROUBLE SHOOTING GUIDE Furnace will not start Tripped blocked vent switch Clear ven...

Page 15: ...hrough Change or insulate ductwork Unheated spaces Low speed switch is on Switch off blower low speed FAN OFF set low Fan control Set FAN OFF higher Motor speed set too high Reset motor speed to slow...

Page 16: ...__________________________ START UP TEST RESULTS Nozzle ________________________________________ Pressure _______________________________________________ Air __________________________________________...

Page 17: ......

Page 18: ...KDF 14A Filter Frame Assembly K00 CB 0025 00 KDF 15 Rear Cabinet Top KD KC KD0 CB 0020 00 KDF 16 Blower Door 3BU 10 00DD 00 KDF 17 Delhi GT10 DD Blower 4CA 00 505M 23 KDF 18A Motor Run Capacitor 5 mi...

Page 19: ......

Page 20: ...KDR 14A Filter Frame Assembly K00 CB 0024 00 KDR 15 Rear Cabinet Top KD0 CB 0020 00 KDR 16 Blower Door K00 CB 0103 00 KDR 17 5 Flue Pipe Collar 3BU 10 00DD 00 KDR 18 Delhi GT10 DD Blower 4CA 00 505M 2...

Page 21: ......

Page 22: ......

Page 23: ......

Page 24: ......

Reviews: