5
Instructions for Assembly
■
Ensure that you have received all the parts required (see check
list) and that they are undamaged. Should you have any cause
for complaint, please contact your KETTLER dealer.
■
Before assembling the equipment, study the drawings carefully
and carry out the operations in the order shown by the dia-
grams. The correct sequence is given in capital letters.
■
Please note that there is
always
a danger of injury when wor-
king with tools or doing manual work. Therefore please be ca-
reful when assembling this machine.
■
Ensure that your working area is free of possible sources of
danger, for example don’t leave any tools lying around. Al-
ways dispose packaging material in such a way that it may not
cause any danger. There is always a
risk of suffocation
if chil-
dren play with plastic bags!
■
The equipment must be assembled with due care by an adult
person. If in doubt call upon the help of a second person, if
possible technically talented.
■
The fastening material required for each assembly step is
shown in the diagram inset. Use the fastening material exactly
as instructed. The required tools are supplied with the equip-
ment.
■
Bolt all the parts together loosely at first, and check that they
have been assembled correctly. Tighten the locknuts by hand
until resistance is felt,
then use spanner to finally tighten nuts
completely against resistance (locking device).
Then check that
all screw connections have been tightened firmly.
Attention:
once locknuts have been unscrewed they no longer function
correctly (the locking device is destroyed), and must be repla-
ced.
■
For technical reasons, we reserve the right to carry out preli-
minary assembly work (e.g. addition of tubing plugs).
GB
List of spare parts page 29-31
When ordering spare parts, always state the full article number,
spare-partnumber, the quantity required and the S/N of the pro-
duct (see handling).
Example order:
Art. no. 07861-400 / spare-part no. 10100030
/ 2 pieces / S/N ....................
Please keep original packaging of this article, so that it may be
used for transport at a later date, if necessary.
Goods may
only
be returned after prior arrangement and in
(internal) packaging, which is safe for transportation, in the ori-
ginal box if possible.
It is important to provide a detailed defect description / damage
report!
Important:
spare part prices do not include fastening material; if
fastening material (bolts, nuts, washers etc.) is required, this
should be clearly stated on the order by adding the words
„with
fastening material“
.
Waste Disposal
KETTLER products are recyclable. At the end of its useful life ple-
ase dispose of this article correctly and safely (local refuse sites).
KETTLER (GB) Ltd.
Merse Road · North Moons Moat · Redditch, Worcesters-
hire B98 9HL · Great Britain
http://www.kettler.co.uk
KETTLER International Inc.
1355 London Bridge Road · VA 23453 Virginia Beach
USA
http://www.kettlerusa.com
USA
GB
Summary of Contents for Satura M
Page 21: ...21 3 4x M8x70 ø44 5x8 4 1 2 klick klick ...
Page 22: ...22 4 4x 3 9x13 C 1x M5x12 A 1x 2x ø6x9 5 2x ø6x9 5 1x a c b A B C A B C D E F ...
Page 24: ...24 7 6 1x 3 9x19 M5x80 ø10x42 ø15 5x5 3 M5 1x 8 2x M6x16 ø16 5x6 4 9 2x M8x16 ø25x8 4 ...
Page 32: ...HEINZ KETTLER GmbH Co KG Postfach 1020 D 59463 Ense Parsit www kettler de docu 2217b 11 08 ...